MEETING NOTICE AND AGENDA
WEST CONTRA COSTA
TRANSPORTATION ADVISORY COMMITTEE
LOCATION: City of
NOTES:
1.
Call to Order and Self-Introductions – Chair
2.
Public Comment –
Please fill out a speaker card and hand it to the Chair/Staff
At this time,
the public is welcome to address the WCCTAC on any item which does not
otherwise appear on the agenda. With a
full agenda, comments may be limited to three minutes per speaker.
***** CONSENT CALENDAR *****
3.
Minutes, Sign-In
Sheet and Meeting Summary from the
ing – ATTACHMENTS
The minutes, sign-in sheet, and meeting summary from the December meeting are attached.
Staff Recommendation: Approve the December 2003 minutes.
4. Staff
Reports – ATTACHMENTS
Employee Staff Reports from the Managing Director and the Transportation Project Specialist for December are attached.
Staff Recommendation: Accept the reports.
5. Update on the State Transportation Improvement Program (STIP) – ATTACHMENT
Attached is information from the January CCTA Administration and Projects Committee regarding the 2004 STIP. As expected, there is no additional funding and the new CTC funding target indicates that projects may be delayed from one to four years.
Staff Recommendation: No action required; for information only.
6.
Draft
Amendments to CCTA’s Administrative Code – ATTACHMENT
CCTA is looking to correct some “ambiguities” in the Administrative Code regarding the composition of each Regional Transportation Planning Committee and the current RTPC practices. Two options are proposed: Option A is very specific regarding the composition of the RTPCs and would require a change to the Administrative Code if an RTPCs composition changed; Option B is simpler and would not require Administrative Code changes if the RTPC composition changed.
Staff recommends Option B.
Staff Recommendation: Support Option B; direct staff to convey WCCTAC’s preference to CCTA staff.
7. 2004 Strategic Plan Revisions – ATTACHMENT
CCTA adopts a revised Strategic
Plan every two to three years for the Measure C projects. While there are some “unknowns” regarding
transportation funding, CCTA has asked the RTPCs to review and comment on the
Project Fact Sheets and revised cash flow requirements for various
projects. There are no
Staff Recommendation:
8.
WCCTAC
Meeting Schedule
A revised schedule for January through June is attached (typographical error corrected).
Staff Recommendation: No recommendation; for information only.
9.
Purchase of
Services Contract with Greyline Cab – ATTACHMENT
WCCTAC’s contract with Greyline Cab for Guaranteed Ride Home taxi services has expired and a new contract needs to be negotiated.
Staff Recommendation: Authorize the Managing Director, Transportation Project Specialist, and Advising Attorney to negotiate and draft a new contract. Bring contract to WCCTAC Board for review and approval at a later meeting.
10. Support for Regional Measure 2 (Perata) for
$1 Increase to Toll on State-Owned Toll Bridges – ATTACHMENT
Regional Measure 2 (RM 2) would increase the bridge toll by $1 to support congestion relief and transit projects. RM 2 will be on the March 2004 ballot. Information on RM 2 is attached, as is draft Resolution 04-01.
Staff Recommendation: Review and approve Resolution 04-01; direct staff to distribute the Resolution.
11. WCCTAC Reserve Balance Recommendations –
ATTACHMENT
The attached Memorandum, prepared
in consultation with WCCTAC’s Treasurer (
Staff Recommendation: Review and approve the recommendations in the Memorandum.
*****
END OF CONSENT ITEMS *****
ACTION ITEMS:
The order for discussion of
Action Items is as follows: (1) Staff Report; (2) Public
Comment; (3) Board Discussion
and Questions; (4) Action/Vote.
12.
Election of
Officers and Representatives: (a) WCCTAC Chair; (b) WCCTAC Vice Chair; (c) CCTA
Representative (even-year term); and (d) CCTA Alternate – STAFF and CHAIR –
ATTACHMENT – 15 minutes
ACTION ITEM
(a)
WCCTAC Chair – The Board will need to
elect/reappoint a Chairperson commencing
(b)
WCCTAC Vice Chair – The Board will need to
elect/reappoint a Vice Chair commencing
(c)
CCTA Representative – WCCTAC’s “even-year” term
(currently filled by Janet Abelson) is expiring. The Board will need to reappoint Ms. Abelson
or elect a new representative for the term from
(d) CCTA Alternate – The Board will need to reappoint the current alternate – Maria Viramontes – or elect a new alternate. The CCTA Alternate serves until replacement/resignation and is the alternate for both CCTA representatives.
Background:
Other WCCTAC Chairs/Vice Chairs have served for two years for
continuity. Previous Chairs (in order of
most recent):
Note: According to the WCCTAC JPA, only the Cities and the County may vote for the CCTA Representative – six votes total (one each – El Cerrito, Hercules, Pinole, Richmond, San Pablo, Contra Costa County); four votes are required for a majority vote).
Staff Recommendation: No recommendation; Board action as appropriate.
13. Measure C Issues: (1) Report from WCCTAC Measure C Subcommittee; (2) West County Outreach; and (3) CCTA’s Public Outreach – ATTACH-MENTS/HANDOUT – STAFF – 15 minutes
ACTION ITEM
(1) WCCTAC Measure C Subcommittee – The Subcommittee met on January 14th. A quorum was not present, but the members in attendance requested that two items be forwarded to the WCCTAC Board: (a) the draft letter (attached) requesting CCTA prepare subregional marketing materials for the continuation of Measure C; and (b) discuss the attached Memorandum from the WCCTAC-TAC regarding outreach materials for Measure C and the letter from the City of San Pablo (received subsequent to the WCCTAC-TAC meeting) – ATTACHMENTS
(2)
(3)
CCTA staff and the RTPCs are hosting meetings
throughout the county to discuss the Draft Countywide Transportation Plan, the
Draft Environmental Impact Report and the Measure C project/program
alternatives. The
Staff Recommendation: Review and approve the letter regarding subregional marketing materials; other potential actions to be determined by the WCCTAC Board.
14.
Richmond-Area Community-Based Transportation
Plan – SEPARATE ATTACHMENTS – Gail Murray, Nelson/Nygaard and Barbara Bechnel,
Neighborhood House of North Richmond – 20 minutes
INFORMATION/ACTION
Information Item: In 2003, MTC contracted with Nelson/Nygaard and Neighborhood House of North Richmond to prepare the first of five pilot transportation planning reports in low-income Bay Area Communities. The planning effort took place between April and December 2003, and built upon the findings in MTC’s 2001 Lifeline Transportation Network Report. Ms. Knudsen and Ms. Murray will summarize the study findings and “next steps.” WCCTAC Staff participated in a number of the community meetings and planning meetings. There will be a fifteen minute presentation, followed by five minutes of question/answer. The Plan’s Executive Summary is attached (SEPARATE ATTACHMENT).
Action Item: In order to implement some of the findings/recommendations in the study, Neighborhood House is requesting funds from WCCTAC’s Regional Studies budget to hire a part-time staff person to write grant applications and to oversee the next phases of the Plan (SEPARATE ATTACHMENT).
Staff Recommendation: Receive the Plan; provide comments. Underscoring the need to implement the projects and programs in the Richmond-Area Community-Based Transportation Plan, staff recommends approval of the funding for the staff person to apply for grants and oversee the next phases of the Plan (under the direction of Ms. Barbara Bechnel at Neighborhood House).
15.
Follow-Up to
WCCTAC Board Retreat on January 16th – ATTACHMENT – Staff – 15
minutes
ACTION ITEM
Thirteen Board members and alternates participated in the four-hour Retreat. Staff appreciates the time and participation of the elected officials/Board members, and the staff who were present at the Retreat.
Staff would like to highlight several follow-up items:
1. Staff will obtain copies of the PowerPoint presentations and provide them to the WCCTAC Board members.
2. Staff
will further research the Columbia Pike Project in
3. Staff will work with Susan Christy (Facilitator) and Board members who have not yet completed the “Team Dimensions Profile” so that once all Board members have finished the profile, we can have a full discussion of the ways that we prefer to work, based upon the results (“Creator,” “Advancer,” “Refiner,” or “Executor”).
4. The results of the Measure C discussion are summarized in the attached Memorandum, including the recommendations to be forwarded to CCTA.
Staff Recommendation: Provide time for Board members comments on the Retreat; review the follow-up items; approve the recommendations in Item 4 and direct staff to forward a letter to CCTA.
INFORMATION ITEMS:
16. University of California’s Institute of Transportation Studies –
San Pablo Avenue Smart Growth Project and Recommendations – UC Berkeley
Students – PRESENTATION AND POSSIBLE HANDOUT – 10 minutes
UC Berkeley students in the
Staff Recommendation: No recommendation; for information only.
17.
Presentation
and Discussion of the Draft Countywide Transportation Plan (Draft CTP) and the
Draft Environmental Impact Report (Draft EIR) on the Draft CTP – ATTACHMENT –
CCTA STAFF – 15 minutes
CCTA staff will present the Draft CTP which has been distributed by CCTA (copies will be available at the meeting). The Draft EIR will be released the week of January 19th and copies will be available at the meeting.
Comments on the Draft CTP and the Draft EIR are due on
Staff Recommendation: No recommendation; for information only. Comments will be discussed at the February Board meeting.
18. Correspondence/Other Information:
Incoming:
Local Government Commission Reports – December 2003.
CCTA Items Approved for Circulation –
Richmond Bay Trail New Year Report – January 2004.
TRANSPAC Meeting
Summary –
CTP and Measure C
Extension Proposed Meeting Schedule –
Outgoing:
Letter to David Murray at CCTA re: STMP Administrative Fees – 12.16.03.
Letter to Office of Traffic Safety re: Grant Application – 1.13.04.
Newspaper/Internet Articles (all articles from
“Bus Cuts’ Impact Harder on Disabled, Seniors” – 12.26.03.
“Commuter Bus Service Delayed Till February” – 12.29.03.
“Blueprint OK’d for Bicyclists, Pedestrians” – 1.2.04.
“Greenway Restoration on its Way” – 1.6.04.
“Transportation Funds to be Tied to Housing” – 1.12.04.
“Transportation (from Budget Analysis)” – 1.12.04.
Conferences/Workshops:
ABAG Regional
Economic Outlook – January 29 in
CTF Transportation
Forum – February 25 in
American Planning
Association National Conference – April 24 to 28 in
Community
Transportation Expo – June 12 to 18 in
19. Board Member Comments/Reports
20. Other
Business
ADJOURN TO NEXT
MEETING: