MEETING NOTICE AND AGENDA
WEST CONTRA COSTA
TRANSPORTATION ADVISORY COMMITTEE
NOTE DAY: FRIDAY, DECEMBER
10, 2004
NOTE TIME: 7:30 AM TO 9:30
AM
HOLIDAY REFRESHMENTS WILL BE SERVED COMMENCING AT 7:20 AM
LOCATION: City of San
Pablo, Council Chambers
13831 San Pablo Avenue (at Church Lane) - San Pablo, California
NOTES:
1.
Call to Order and Self-Introductions – Chair Kris Valstad
2.
Public Comment –
Please fill out a speaker card and hand it to the Chair/Staff
At this time,
the public is welcome to address the WCCTAC on any item which does not
otherwise appear on the agenda. With a
full agenda, comments may be limited to three minutes per speaker.
***** CONSENT CALENDAR *****
3. Minutes, Sign-In Sheet, and Meeting Summary
from the October 29, 2004 Meeting –ATTACHMENTS
The minutes, sign-in sheet, and meeting summary from the October 2004 meeting are attached.
Staff Recommendation: Approve the October 2004 minutes.
4. Staff
Reports – ATTACHMENTS
Employee Staff Reports from the Managing Director, the Management Assistant, and the Transportation Project Specialist for November are attached.
Staff Recommendation: Accept the reports.
5. Cooperative Agreement Between WCCTAC and CCTA for FY 04-05 Transportation Fund for Clean Air (TFCA) and Measure C Projects/Funds – SEPARATE ATTACHMENT FOR BOARD MEMBERS ONLY
Annually, WCCTAC and CCTA sign a Cooperative Agreement for the TFCA and Measure C project/funds. The FY 04-05 projects were approved previously and include: the Countywide Guaranteed Ride Home Program, the Employer Based Trip Reduction Program, and the I-80 Corridor Transit Incentive Project. The Cooperative Agreement is attached for Board Members only.
[Copies may be obtained in advance of the meeting by calling Lisa Hammon at 510.215.3044 or copies will be available at the meeting.]
Staff Recommendation: Upon approval by WCCTAC’s advising attorney, authorize the Chair to sign the Agreement.
6. Amendment #1 to the Professional Consultant
Services Agreement with Summer Brenner - ATTACHMENT
Attached is Amendment #1 to the Professional Consultant Services Agreement between WCCTAC and Summer Brenner which extends the contract for one year to December 31, 2005. All other terms and conditions remain the same.
Staff Recommendation: Upon approval by WCCTAC’s advising attorney, authorize the Chair to sign the Amendment.
7. Lease Agreement Between WCCTAC and the City
of San Pablo – ATTACHMENT
The City of San Pablo has requested that WCCTAC enter into a Lease Agreement (formerly a Service Agreement).
Staff Recommendation: Upon approval by WCCTAC’s advising attorney, authorize the Chair to sign the Lease.
8. Low-Income Flexible Transportation (LIFT) Program Grants – ATTACHMENT
Attached is the proposed list of projects for LIFT funding. The list includes the following projects in West Contra Costa County: (1) Neighborhood House of North Richmond - bus benches and a transportation coordinator; and (2) WestCAT - new fixed route service to Contra Costa College.
Staff Recommendation: No recommendation; for information only.
9. WCCTAC Financial Statements for FY 03-04
and Memorandum on Internal Control Structure – ATTACHMENT (MEMO FROM OCTOBER
2004 BOARD MEETING)/SEPARATE ATTACHMENT (FINANCIAL STATEMENTS) FOR BOARD
MEMBERS
Maze and Associates prepared the Financial Statements for FY 03-04 and the Memorandum on Internal Control Structure. The documents are attached for Board members only. The Memorandum regarding financial issues from the October 2004 Board meeting is attached for reference/background.
[Copies may be obtained in advance of the meeting by calling Lisa Hammon at 510.215.3044 or copies will be available at the meeting.]
Staff Recommendation: Accept the Financial Statements and Memorandum on Internal Control Structure.
10. Agenda Items for January 2005 Meeting
ü Update and/or action on the Subregional Transportation Mitigation Fee Program.
ü Reappoint or elect a new WCCTAC Chair and Vice Chair.
ü Reappoint or elect a new representative for the “odd-year” CCTA representative position (February 1, 2005 to January 31, 2007).
ü WCCTAC Internship Program.
ü Approval of the revised West County model.
ü Workshop on “Form Based Codes” following the Board meeting.
Staff Recommendation: No recommendation; for information only.
*****
END OF CONSENT ITEMS *****
ACTION ITEMS:
The order for discussion of
Action Items is as follows: (1)
Staff Report; (2) Public
Comment; (3) Board Discussion
and Questions; (4) Action/Vote.
11.
Summary of Richmond
Intermodal Station/Transit Village Agreements and Approval of Agreements for
Professional Consultant Services with VBN Architects and MACK5 – Staff –
ATTACHMENT – 15 minutes
ACTION ITEM
The attached Memorandum provides information on the current consultant contracts for the Richmond Intermodal Station/Transit Village project.
Staff Recommendation: (1) Receive the summary of open contracts for the Richmond Intermodal Station/Transit Village; and (2) following approval by WCCTAC’s advising attorney, authorize the Chair to sign the agreements with VBN Architects and MACK5.
INFORMATION
ITEMS:
12. Update
on the Hercules Transit Center Relocation – Steve Lawton, Community Development
Director, City of Hercules – ATTACHMENTS – 15 minutes
Steve Lawton from the City of Hercules will provide a ten-minute overview of the Hercules Transit Center Relocation and there will be five minutes for questions. Two documents are attached for background: (1) Memorandum of Understanding between BART and the Redevelopment Agency of the City of Hercules; and (2) site maps of the location.
Staff Recommendation: No recommendation; for information only at this time.
13.
Parchester Village
Elementary School Bus Service – Staff – ATTACHMENT and VERBAL REPORT– 10
minutes
Current information: (A) The LIFT grant was not successful; and (B) The Parchester elementary school bus is funded by a private, anonymous donor through December.
At the meeting, staff will provide a further verbal report on fundraising activities as well as other options for the Parchester Village elementary school bus.
Staff Recommendation: No recommendation; for information only.
14. Correspondence/Other Information:
Incoming:
10.21.04 – TRANSPAC meeting summary.
11.1.04 – Email from Bob McCleary – Press Release – New Caltrans Director.
11.8.04 – MTC November 2004 Election Results.
11.8.04 – TRAC Funding.
11.18.04 – Items approved for circulation by CCTA.
11.19.04 – Capitol Corridor Rail News.
Outgoing:
VBN Notice to Proceed – 11.9.04.
Newspaper/Internet Articles (all articles from West County Times unless stated otherwise):
“Comments to Start on Garage Proposal;” 10.29.04.
“Toll Money will Help Rail, Bus, and Ferry Service; “ 10.29.04.
“Compromise Boosts Winning Transit Tax;” 11.7.04.
“Transit Panel Lays Out Plans for Bay Area;” 11.13.04.
Conferences:
LCG Building Livable Communities: “Two for the Price of One,” Yosemite, March 17-20, 2005.
15. Board Member Comments/Reports
16. Other
Business
HAPPY HOLIDAYS!!
ADJOURN TO NEXT MEETING:
JANUARY 28, 2005