WCCTAC

               West Contra Costa Transportation Advisory Committee

 

MINUTES

 

March 31, 2006

 

 

The regular meeting of the West Contra Costa Transportation Advisory Committee was called to order at 7:30 A.M. on Friday, March 31, 2006 by Chair Sharon Brown in the City Council Chambers of the City of San Pablo, 13831 San Pablo Avenue, San Pablo, California

 

 

Call to Order / Self Introductions

 

PRESENT:     Janet Abelson (El Cerrito), Ed Balico (Hercules), David Cole (Pinole), Bob Franklin (BART), John Gioia (Contra Costa County), Jerrold Parsons (WestCAT), Maria Viramontes (Richmond), Joe Wallace (AC Transit), and Chair Sharon Brown (San Pablo)

 

ABSENT:      Irma Anderson (Richmond) and Tom Butt (Richmond)

 

STAFF:         Lisa Hammon, WCCTAC Managing Director

                   Linda Young, WCCTAC Transportation Project Specialist

                   John Rudolph, WCCTAC Management Assistant

                   Nancy Cuneo, WCCTAC Administrative Analyst

                   Bryan Otake, Attorney – Meyers Nave

                   Paul Maxwell, Contra Costa Transportation Authority (CCTA)

                   Hisham Noeimi, Contra Costa Transportation Authority (CCTA)

 

 

Chair Brown took this opportunity to congratulate Janet Abelson who had been honored in Sacramento on March 20 as one of California’s Women of the Year for 2006.  She had been selected by Assemblywoman Loni Hancock to receive that honor.

 

Chair Brown also congratulated Tom Butt who was the new Vice Chair of the Local Government Commission. 

         

 

 

 

 

Public Comment

 

There were no comments from the public.

 

 

Consent Calendar

 

On motion by Joe Wallace, seconded by Janet Abelson and carried unanimously, the WCCTAC Board adopted the Consent Calendar, as follows:

  

3.                 Approved Minutes, Sign-In Sheet and Meeting Summary from the February 24, 2006 Meeting.

 

4.                 Accepted Employee Staff Reports from the Managing Director, the Management Assistant, and the Transportation Project Specialist for March.

 

5.                 Approved the applications for 511 Contra Costa – West County Projects for FY 06-07 and directed staff to forward the applications to the CCTA.

 

6.                 Received West County Bus Shelter Program Update.

 

 

Transit Summit (“Go I-80”) Draft Outline

 

Managing Director Lisa Hammon reported that the “Go I-80” Transit Summit had been scheduled for Thursday, May 11 at Maple Hall in the City of San Pablo.  The draft outline and schedule for that event was presented to the WCCTAC Board for review and discussion.

 

Ms. Hammon advised that the summit would begin at 5:30 P.M. with an Information Fair and refreshments, and with table participants that would have information that members of the public could pick up and have discussions with staff followed by a welcome from the WCCTAC Chair, a discussion of upcoming projects and a prioritization exercise to help feed into the Strategic Plan to be developed for Measure J.  She noted that Summer Brenner was helping on the project. 

 

Ms. Hammon added that there had been a discussion of a youth focus since youth were the next generation that would use transit more and more.  Time would be spent on Building for Tomorrow – Youth Transportation.  A keynote speaker had been proposed along with a presentation on transportation, transportation funding, transportation’s relationship to housing, land use and the economy, how to get involved, and the schedule for local and regional transportation meetings, followed by next steps.  The summit was scheduled to end at 8:00 P.M.  She sought comments and suggestions for the planning for the next Transit Summit.

 

Chair Brown recommended that the youth commissions from all cities be contacted.

 

Janet Abelson suggested that the high schools also be contacted.

 

Ms. Hammon reported that the item would be returned to the agenda for the next WCCTAC meeting in April.

 

 

Rail-Volution Conference – November 4 to 8 -  Chicago, IL

 

Managing Director Hammon reported that this year the conference would be November 4 to 8 in Chicago, which conference would focus on all modes of transit and transportation.  She noted that last year the WCCTAC covered the conference registration fees.  She sought direction on who would like to attend the conference and what fees would be covered by WCCTAC.

 

Ed Balico and Joe Wallace expressed an interest in attending the Rail-Volution Conference while Bob Franklin noted that he had already been scheduled to attend the conference representing BART at BART’s expense.

 

On motion by Maria Viramontes, seconded by Janet Abelson and carried unanimously, the WCCTAC agreed to pay for the registration of those members planning to attend the Rail-Volution Conference in Chicago from November 4 to 8, 2006.

 

 

Update on the Subregional Transportation Mitigation Fee Program (STMP)

 

Managing Director Hammon presented the update on the Subregional Transportation Mitigation Fee (STMP) Program.  She noted that comments from Richmond were anticipated.  Comments had been received from all other jurisdictions in the County.  Final comments and the final draft of the STMP Program would be sent out within the next ten days or so and the documents would be ready for action by the WCCTAC Board at its April meeting, to then be forwarded to the cities and the County for adoption.

 

Bryan Otake reported that feedback had been received from most agencies, including the County, and most changes had related more to form than substance.  He stated that the proposed final draft would be circulated for final comment and review to be able to be submitted to the WCCTAC at its April meeting.  He added that things were on track in terms of legal comment and review.

 

Ms. Hammon clarified, when asked, that the documents had not been included in the WCCTAC packet at this point pending final comments.  She referred to the Ad-Hoc Working Group Report which had discussed specific language regarding casino projects, which language would also be included in the final draft.

 

With respect to the advancement of funds prior to the finalization of projects and the funding strategy with STMP projects, Ms. Hammon advised that she was preparing a Request for Proposal (RFP) for consultant assistance to prepare that strategy.  While there had previously only been three West County projects and no strategic plan was needed, in this case there would be eleven projects requiring more cash flow analysis over the 25 years of the program and requiring a description of each of the projects.  The process of actually developing the strategic plan could be funded once the fees were collected. There would be no impact to the WCCTAC budget other than fronting the money pending collection.

 

In response to Ed Balico, Ms. Hammon clarified that the item related to the developer fee program although there was an overlap with Measure J programs.  As such, the timing from both developer fees and Measure J would have to be addressed.  She reported that the WCCTAC Technical Advisory Committee (TAC) would develop a list of projects when there were overlapping funds.  The first draft of that project list had been presented at the last WCCTAC meeting.

 

 

Measure J Items: (A) Policies approved by the Contra Costa Transportation Authority and Circulated to the Regional Committees for Comment; (B) West County Project Priorities in Measure J/Developer Fee Program: (C) Meetings and/or Discussion with Legislators Regarding West County Projects (Follow up from the February 24 meeting)

 

Managing Director Hammon stated that the first part of the item related to what had been approved by the Authority at its last meeting.

 

Paul Maxwell reported that the draft policies that the CCTA had adopted at its March meeting had been submitted to the Regional Transportation Planning Committees (RTPCs) and the transit agencies for review and comment.  Those draft policies had been included in the Draft “Measure J Financial Framework and Associated Policies.” 

 

Mr. Maxwell noted that this was the first time that there had been an opportunity to look at how to implement Measure J programs.  Three issues had been discussed; how the CCTA was proposing to differentiate between programs and projects, how to do any advance planning in advance of Measure J taking effect in 2009, and how that advance project funding would be implemented. 

 

In the first category, Mr. Maxwell stated that the WCCTAC Board had elected for Measure J to put more sales tax revenues into programs rather than projects.  He explained how those revenues would be accounted for on an annual basis.  The policies suggested that every year when the CCTA received sales tax revenues it would immediately put the appropriate portion of the revenue into each program into a separate account at the CCTA.

 

As far as the projects were concerned, the CCTA committed to a $300 million bond issue in 2009 with a subsequent bond issue of $150 million in 2012, so that a portion of the revenue for projects would go into separate accounts to pay the debt service on the bond issue and to pay for the projects.  He stated that there were some hybrid programs that could have an operational element and a capital element, such as the Express Bus program, where the funds could be conceived of as being allocated annually for operations or using the money initially to buy the buses to run the service.

 

Mr. Maxwell highlighted the table included in the WCCTAC packet, “Element Classifications – Measure J Transportation Expenditure Plan: Categorization of Elements.”  He stated the policy envisioned that prior to 2009; each RTPC would look at those hybrid elements to determine whether or not to allocate a portion of those programs to capital acquisition.  He stated that the CCTA needed to determine between now and the middle of Measure J whether or not the hybrid programs had a capital element required up front that would be set aside separately. 

 

As far as the other two policies, Mr. Maxwell explained that advancing studies for Measure J programs had become an issue because in southwest county there was a new school transportation bus program and the CCTA had been asked whether to not it would be willing to reimburse them for advance planning to put their buses on the street in 2009. That request had caused a debate as to whether or not funding could be advanced for those jurisdictions.  He noted that proposed policies did not allow that but allowed under special circumstances to permit a proponent of a Measure J program to come to the CCTA and ask ahead of time for the CCTA to approve an advanced funding planning study to be reimbursed in 2009.  He added that the amount of money to be reimbursed could not exceed 25 percent of the annual expected allocation of that program.

 

With respect to the third area of project development, Mr. Maxwell stated that because the large bond issue had been committed in 2009 and under federal IRS rules that money had to be spent down in three years, it was important that enough projects were ready to be able to spend the money between 2009 and 2012.  He and Hisham Noeimi had been working with several projects ready to go out to bid.  He stated that the large projects; i.e. the Caldecott Tunnel and Highway 4 represented a greater effort and there was advance work in those cases using money other than Measure J funds. 

 

Mr. Maxwell added that the Managing Director and El Cerrito staff had discussed the advancement of I-80 projects and looking at ways to use Measure C funds and federal demonstration money to get those projects ready to be available to use the bond proceeds if there was capacity to do that.

 

Mr. Maxwell stated that had caused the CCTA to consider “metering” the funds for advance development.  He noted that a planning effort would require a local component to get the concurrence of the RTPC to seek an appropriation of funds to do the advanced project development work, using either Measure C money or with a policy where the CCTA would borrow money on a short term basis to do the project development work prior to 2009.  In that case, reimbursing the local jurisdiction or doing the work themselves to advance the projects. 

 

Stating that those were the three areas in the policy, Mr. Maxwell added that clearly there would be policies to address with other programs such as school transportation for children, BART programs, paratransit, and Express Bus, all of which would need additional policies for implementation.  In the next one to two years the RTPCs, transit staff and transit agencies would work together to figure out how that would work. 

 

Mr. Maxwell raised the issue of reserves under Measure J and the discussions that had proposed a 3 percent reserve in years where there were significant revenues exceeding CPI that could be used in years when revenues were less than anticipated.  Another area would be the Livable Communities Program and how that would be implemented, which were issues to be addressed over the next couple of years.  He explained that this policy would begin that process.  He noted that the CCTA was actually in the process of expanding staff that would be responsible for managing the Measure J programs. 

 

Ms. Hammon advised that the April meeting of the WCCTAC TAC would consider the hybrid projects.   With respect to the program side and the allocation of funds over the life of Measure C, she asked whether there was any room to negotiate something different from a set of funding every year.

 

In response, Mr. Maxwell noted that would probably not be prudent as a general rule given the need for funds on an annual basis to fund transit programs.  While not recommended, if there was a specific program that needed more money earlier than later, that possibility could be explored.  As a general rule, the funds would be secured annually and disbursed annually.  He stated that the way the program was being developed the funds would be guaranteed to be available and waiting to be used on an annual basis, although a particular project and a particular need could be considered.

 

Ed Balico recommended the use of a program manager to treat programs like projects in terms of management.  With respect to reimbursement, he stated that some cities such as Hercules were waiting for a couple of projects, in Hercules’ case the train station and the bus depot.  Because of the expense, he recommended that when a project was ready for construction there be no delay in funding. 

 

Ms. Hammon stated that the train station was a good example of using developer fee funds because if ready to proceed those funds could be used prior to Measure J funds, which was the balancing act and the timing issue between the funds in the developer fee program and the funds in Measure J. 

 

Mr. Maxwell added that the policies anticipated advancing money for project development.  While possible, if that happened, funds would be borrowed in advance of Measure J and there would be a cost to do that.  As long as a proponent was willing to shoulder the cost and the RTPC was supportive, the CCTA would likely be willing to consider that on an individual basis.  He noted that did not make sense for every project.  He suggested that would be a good comment for the RTPCs to make.

 

John Gioia suggested it would be useful to have some sort of intent and purpose about the advancing of some of the projects.  To the extent an advancement would save money with some projects more than others, and with the need to alleviate congestion, he stated it made sense to reflect that policy in the document.  A comment to that effect, to save money by having capital projects completed earlier, was recommended.  He recommended that the Transportation Expenditure Plan (TEP) be spelled out for clarification.

 

Maria Viramontes asked for a clarification of which projects in West County would be advanced under the reauthorization of Measure C, which had been approved and which would be considered under Measure J and whether or not everyone would get street funds. 

 

Mr. Maxwell advised of the status of the projects in question, to which Ms. Viramontes acknowledged that all the major issues of funding had been settled.

Mr. Maxwell added that there was enough money in the program for 2009 to fulfill all requirements under 18 percent return to source funds and all programs were fully taken care of, although there might be a cash flow issue.  If that were to occur, he explained that a short term note or line of credit would fulfill those commitments.  Between now and 2009 there would be enough Measure C funds available to fill the requirements. 

 

In terms of the Central Avenue project, Mr. Maxwell stated that there was federal demonstration money for the CCTA to take the lead in conducting a Project Study Report (PSR) followed by the environmental impact studies and the final design of that project.  For San Pablo Dam Road, he added that Caltrans had already done a PSR and environmental studies would be done using Measure C funds now, to be repaid in 2009.  He noted a slowdown in that case given some issues related to Caltrans rules and procedures.  An RFP for that work should be undertaken in May.

 

Hisham Noeimi stated with respect to the Hercules Train Station project that there was agreement to provide $2 million to cover the shortfall in that project.  For the parking structure, the project was now fully funded and $5.9 million from Measure C had been put into that project, to be constructed in 2007/2008.  For Central Avenue, some Measure C funds had to be fronted for the 20 percent demonstration fund match.

 

Ms. Viramontes asked for information as to how Richmond could file for its 18 percent for streets and roads from past years.

 

Janet Abelson commented that since most of the funding had been placed into programs, there was a need to make sure that those funds had been secured.  She stated it was the intent in the development of Measure J that those would be for operating programs so that in the bus category the bus operators would get funds to operate the buses, with the funds to be needed on an ongoing reliable basis through the life of Measure J.  She suggested that was an underlying strategy to be addressed.  As an exception, she suggested looking at paratransit in Measure C to set aside a reserve.  She did not know if there was a reserve to enable the continued operation of the paratransit programs at the current level over time.  She urged a process to ensure that high priority programs would be appropriately funded to allow functional operation over time.

 

Mr. Maxwell referred to Page 12 of 15 of the Framework report related to the reserves where some of those issues had been discussed.  He sought comments to the CCTA on that report.

 

 

WCCTAC Budget, Dues, and Scope of Work for FY 06-07

 

Managing Director Hammon presented the staff report for the WCCTAC Budget.

Ms. Hammon highlighted the differences between the Fiscal Year 05-06 and 06-07 budgets.  She stated that the budget was essentially the same as last year and that the dues would remain the same. 

 

Ms. Hammon stated that comments and revisions would be returned to the June meeting for adoption.  She recommended action to authorize the submittal of the budget to the agencies for comment, with comments to be returned by the end of May to allow final action by the WCCTAC Board at its June 30, 2006 meeting.  She noted that there would be a request that the budget be placed on the same agenda as the developer funds presentation to expedite the process.

 

On motion by Maria Viramontes, seconded by Ed Balico and carried unanimously, the WCCTAC Board directed staff to forward the documents to the member agencies and request comments by May 31 to allow final action by the WCCTAC Board at its June 30, 2006 meeting.

 

 

Taxi Safety in West County

 

Managing Director Hammon reported that since the last month, Sheriff Rupf had met with West County Police Chiefs.  It was her understanding that the Sheriff and police chiefs had discussed the item, to consider the issue of taxi safety and to work on it potentially with support from the Sheriff’s office.  She presented a draft memorandum to Sheriff Rupf to ask for a timeline of when and how to move the item forward.  The memo had explained that the WCCTAC had opportunities to apply for grants and other funding mechanisms to help pay for security shields and cameras in all taxicabs, including a Lifeline Transportation grant that was due April 28.  She noted that the WCCTAC Board had authorized an expense of $10,000 last month for safety equipment and additional information.  She asked the Board to send the memo to Sheriff Rupf and sought comments and feedback from the Board.

 

When asked about the Lifeline Transportation grant, Ms. Hammon noted that a determination of whether or not the grant would become available would be in the June timeframe with the funding potentially available in the fall of 2006.

 

In response to Maria Viramontes as to the training course for taxi drivers and the model taxi ordinance discussed at the last meeting, Ms. Hammon stated that would come from the police chiefs and the Sherriff.  She noted that all of the taxi issues line by line would get a timeline, to be returned to the WCCTAC for discussion at the next Board meeting.

 

Maria Viramontes noted her desire to place the item in Richmond’s budget to provide some funding since Richmond had more taxis than other West County jurisdictions.

Ms. Hammon stated that she would work with Ms. Viramontes individually to prepare something to be submitted to the Richmond City Council.

 

When asked, Bryan Otake explained with respect to the use of public funds for private purpose, that in this case the public purpose was to facilitate safe transportation even though there was a service used publicly albeit through a private company or entities.  He clarified that the taxis were used for a public purpose as part of the overall transportation system. 

 

Janet Abelson noted that the taxi she had recently used had a shield.  She verified with staff that the program would only install shields where there were none.

 

Joe Wallace asked who would monitor the program.  He noted some of the problems with the taxi system and asked who would make sure that the cabs getting the shields on public funds would serve the public and not just the private interest.

 

Ms. Hammon stated that if the WCCTAC was submitting the grant, the WCCTAC would have some responsibly in conjunction with law enforcement.

 

John Gioia emphasized the public interest in support of taxi safety given that taxis served people who used a taxi as his/her only means of transportation.  He urged care to ensure that linkage to the public purpose. 

 

Janet Abelson agreed that some taxi drivers were selective as to the fares his/she would accept.  As such, she emphasized the need for an agreement, to be posted in the taxis, to ensure that taxi drivers who received money from the WCCTAC would truly serve the public.

 

Jerrold Parsons emphasized the need that the taxis serve the entire West County area.

 

On motion by Maria Viramontes, seconded by John Gioia and carried unanimously, the WCCTAC Board approved the memorandum to Sheriff Rupf.

 

 

San Pablo Avenue Vision Project

 

Ted Droettboom presented an update on the Regional Vision, which included focused implementation efforts along San Pablo Avenue.  He explained that the Association of Bay Area Governments (ABAG), the Metropolitan Transportation Commission (MTC) and the Bay Area Air Quality Management District (BAAQMD) were coordinating the regional planning. 

 

Mr. Droettboom described the general program of focusing the vision which took off from Smart Growth strategy, the Livability Project in 2002 and the Shaping Our Future Project in Contra Costa County at approximately the same time.  He emphasized the focus on housing given the public priority in the Bay Area.  He explained that people were moving out of the region and there was difficulty attracting people to the region because of housing costs. 

 

Mr. Droettboom stated that compact development around the Bay with transit oriented development (TOD) would offer significant transportation benefits, reducing congestion from not only housing but a transportation perspective as well, while also saving resources.  He described the regional and local government objectives for development and the collaborative effort to address the San Pablo Avenue corridor.

 

Christy Riviere, ABAG, distributed maps of the San Pablo Avenue corridor and explained that many cities, public agencies and community groups were working to improve San Pablo Avenue as both a destination and a gateway to their communities.  She described the challenges of what to do given the developments proposed and the many issues involved.   She sought comments and input from the public with respect to integrating new design features to improve overall usage and enhance the appearance of the corridor.

 

Joe Wallace expressed his hope that the program would not be used to favor developers given the need for people of low and no income to be able to continue to live in areas that would become too expensive for those people to remain.  He recommended that ABAG partner with the local communities.

 

Ms. Riviere agreed that was a huge issue and a concern that would have to be addressed.  She stated that they had been communicating with local groups and with the individual jurisdictions.

 

The following comments were offered:

 

·        Include the North Richmond Municipal Advisory Council (MAC) (Gioia)

·        Include WestCAT (Balico)

·        Include the requirement for inclusionary Housing Elements (Viramontes)

 

In response to the comments, Ms. Riviere advised that part of the program was to learn what other cities were doing given the great solutions and programs available. She stated that information would be shared so that all could benefit.

 

Ms. Hammon stated that she had been working with groups on the issue and there were ongoing meetings on a technical level.  More information would be brought to the Board.

 

 

AC Transit Schedule and Route Changes and West Contra Costa County Service Plan

 

Robert Del Rosario, Transportation Planner, AC Transit, distributed information on service changes implemented on March 19 to 50 service routes along with a map of three new lines and an All Nighter service which AC transit had implemented with other services in the Bay Area. 

 

With respect to the West Contra Costa County Service Plan, Mr. Del Rosario described the efforts to improve service, make service changes, clean up the network, and expand service.  Phase I would be implemented in August 2006.  He described Phase I as a cost neutral plan with few changes.  Phase II looked to expand service, to be expanded based upon available funding opportunities and Measure J operation funds. 

 

With respect to the proposed changes, Janet Abelson commented that the whole area of the Richmond Parkway Transit Center was marginally accessible given a lack of sidewalks surrounding that center.  She did not believe that the buses should be placed in areas where access was marginal.  She emphasized the need for infrastructure connections to the new lines.

 

Ms. Hammon stated that was a project that the WCCTAC had been working with others to address.  She stated that issue could be returned for discussion.

 

Charlie Anderson of WestCAT clarified that the projects would start with the implementation of Measure J.   

 

Jerrold Parsons recommended that WestCAT and AC Transit work with Ms. Abelson to address some of her concerns.  With respect to the area not being served, he expressed his hope for a collaborative effort to work with WestCAT to serve undererserved areas, particularly the El Sobrante area. 

 

 

Correspondence/Other Information

 

Incoming:

TRANSPAC meeting summary; 2.22.06

City of San Pablo letter to Governor Schwarzenegger; 3.2.06

SWAT meeting summary; 3.15.06

CCTA meeting summary; 3.16.06

TRANSPAC meeting summary; 3.22.06

 

Newspaper/Internet Articles:

(all articles from West County Times unless stated otherwise):“Poll finds majority support school, transportation taxes;” 02.27.06

“Ferry service challenge;” 02.27.06

“$20 million Indian casino bill passes Assembly;“ 02.28.06

“Your commute is shrinking” San Francisco Chronicle; 02.28.06

“Old Town redevelopment puts focus on community;” 03.01.06

“Traffic stalled by Fastrak, study says;” 03.01.06

“Richmond picks paver to work on Greenway trail;” 03.01.06

“Making it worse so it gets better;” 03.02.06

“Voters polled approved of state bond issue;” 03.02.06

“Governor seeks more funding for levees;” 03.02.06

“District condemns Breuner Property to build park;” 03.04.06

“Fare increase considered for ACE commuter trains;” 03.06.06

“GOP split over bond proposals as deadline for June vote nears;” 03.07.06

“Carquinez Bridge is coming down;” 03.07.06

“Lobbyists scramble to get bond proposal on June ballot;” 03.08.06

“Report on casino details positives;” 03.09.06

“State’s largest borrowing plan hinges on support from GOP;” 03.09.06

“Leaders disagree over bond specifics;” 03.10.06

“Contra Costa looks to bond for road repairs;” 03.10.06

“Urban limit line not yet on June ballot;” 03.10.06

“Schwarzenegger’s clout put to test;” 03.11.06

“Rules of Fastrak enrollment explained;” 03.12.06

“Governor, others working to salvage bond measure;” 03.13.06

“Cities ask agency to keep bus service;” 03.13.06

“Bond measure unlikely to appear on June ballot;” 03.14.06

“Clearing skies a reason to take a hike;” 03.16.06

“Bond failure could slow county road projects;” 03.17.06

“Citizens address outline for Pomo Indians casino;” 03.17.06

“Comments sought for transit draft plan;” 03.17.06

“Race, poverty and neglect dominate casino hearing;” 03.17.06

“Governor plans to revive bond for November ballot;” 03.17.06

“Carquinez Bridge deconstruction gets under way;” 03.18.06

 

 

Handouts Available at the Meeting:

Capitol Corridor Draft Business Plan (FY 2006-07 – FY 2007-08)

Information packets on Flex Car, City Car Share, and Zip Car

 

 

Board Member Comments/Reports

There were no comments or reports.

 

 

Other Business    

There was no other business.

 

 

Adjournment

With no further business to come before the WCCTAC, Chair Brown adjourned the meeting at 9:24 A.M. to the next meeting set for April 28, 2006 at 7:30 A.M. at the San Pablo City Council Chambers, 13831 San Pablo Avenue, San Pablo, California.

 

Respectfully submitted,

 

 

Anita L. Tucci-Smith

Minutes Clerk